Phase 1: aluminium windows integrated in fire protection wall elements, unitised stick system with sliding doors, design sheet metal cladding, coping, balcony cladding, sound absorbing roof structures, canopies, oversized doors, planters
Phase 2: wooden aluminium composite windows, aluminium windows, sheet metal cladding, architectural bronze inlays, rooflights, canopies, folding doors, safety doors
Main Contractor: | Mace, London |
Architect: | Phase 1: Squire & Partners, London Phase 2: PDP, London |
Construction: | 2016 - 2019 |
Location: | Chelsea Bridge Road, London/UK |
Sustainability: | LEED Platinum |